DECEMBER KEY FIGURES
| | Dec qtr 10 | Sep qtr 10 to Dec qtr 10 | Dec qtr 09 to Dec qtr 10 |
| | $m | % change | % change |
TREND ESTIMATES(a) |
|
Value of work done | | | |
| For the private sector | 13 777.9 | 5.3 | 15.7 |
| For the public sector(b) | 7 284.1 | -0.3 | -2.9 |
| Total engineering construction | 21 013.2 | 3.0 | 8.2 |
SEASONALLY ADJUSTED ESTIMATES(a) |
|
Value of work done | | | |
| For the private sector | 14 134.2 | 10.7 | 21.1 |
| For the public sector(b) | 7 445.4 | 4.9 | 3.8 |
| Total engineering construction | 21 579.6 | 8.6 | 14.5 |
|
(a) Chain volume measures, reference year 2008-09. |
(b) Includes work done by the private sector for the public sector and work done by the public sector. |
Value of work done, Chain volume measures
| Value of work done, Chain volume measures - Trend estimates
|
DECEMBER KEY POINTS
VALUE OF WORK DONE, CHAIN VOLUME MEASURES
TOTAL
- The trend estimate for the value of total engineering construction work done rose 3.0% in the December 2010 quarter.
- The seasonally adjusted estimate for the value of total engineering construction work done rose 8.6% in the December quarter, to $21,579.6m.
PRIVATE SECTOR
- The trend estimate for the value of work done for the private sector rose 5.3% in the December quarter.
- The seasonally adjusted estimate for the value of work done for the private sector rose 10.7% in the December quarter, to $14,134.2m.
PUBLIC SECTOR
- The trend estimate for the value of work done for the public sector fell 0.3% in the December quarter.
- The seasonally adjusted estimate for the value of work done for the public sector rose 4.9% in the December quarter, to $7,445.4m.
VALUE OF WORK COMMENCED, CURRENT PRICES
- The value of work commenced in the December quarter was $28,759.6m, an increase of 60.2% from the September quarter.
NOTES
FORTHCOMING ISSUES
ISSUE (QUARTER) | Release Date |
March 2011 | 6 July 2011 |
June 2011 | 5 October 2011 |
ABOUT THIS ISSUE
This publication updates the preliminary estimates released in
Construction Work Done, Australia (cat. no. 8755.0) on 23 February 2011.
CHANGES IN THIS ISSUE
No changes in this issue.
SIGNIFICANT REVISIONS THIS QUARTER
Compared with the current price estimates in original terms published in the previous issue of this publication:
- The September quarter work done estimates have been revised down by $112.2m. These revisions occurred predominantly in the Roads, highways and subdivisions and Sewerage and Drainage commodities.
DATA NOTE
Widespread flooding in the eastern states, particularly Queensland, and other recent natural disasters have not affected the quality of statistics in this release. As these events occurred after, or very late, in the December quarter reference period, the overall level of construction activity was not noticeably affected for either national or state level estimates.
INQUIRIES
For further information about these and related statistics, contact the National Information and Referral Service on 1300 135 070.